An Otter Tail Company

Rates, rules and regulations

Complete schedules

Electric service - Minnesota Effective date
Index and General rules and regulations  
Section  
9.00 Residential and farm services  
9.01 Residential service 2/1/2009
9.02 Residential demand control service 2/1/2009
9.03 Farm service 2/1/2009
10.00 General services  
10.01 Small general service (less than 20 kw) 2/1/2009
10.02 General service (20 kw or greater) 2/1/2009
10.03 Large general service 2/1/2009
10.04 Commercial service - Time of use 2/1/2009
       Time of use period chart  
10.05 Large general service - Time of day 2/1/2009
       Time of day period chart  
11.00 Other services  
11.01 Standby service 2/1/2009
11.02 Irrigation service 5/12/2009
11.03 Outdoor lighting - energy only 2/1/2009
11.04 Outdoor lighting 2/1/2009
11.05 Municipal pumping service 2/1/2009
11.06 Civil defense - Fire sirens 2/1/2009
12.00 Purchase power riders and applicability matrix 2/1/2009
12.01 Small power producer rider (Net energy billing rate) - residential, farm, general service, large general service 2/1/2009
12.02 Small power producer rider (Simultaneous purchase and sale billing rate) - firm power, nonfirm power 2/1/2009
12.03 Small power producer rider (Time of day purchase rates) - firm power, nonfirm power 2/1/2009
12.04 Distributed generation service rider 1/27/2010
12.05 Community-based energy development (C-BED) rider 2/1/2009
13.00 Mandatory riders and applicability matrix 2/1/2010
13.01 Energy adjustment rider 2/1/2009
13.02 Conservation improvement project (CIP) program rider 11/1/2009
13.03 Competitive rate rider - Large general service 2/1/2009
13.04 Renewable resource cost recovery rider 8/1/2009
13.05 Transmission cost recovery rider 2/1/2010
14.00 Voluntary riders and applicability matrix 2/1/2009
14.01 Water heating control rider 2/1/2009
14.02 Real time pricing rider 2/1/2009
14.03 Large general service rider 2/1/2009
14.04 Controlled service - Interruptible load CT metering rider (Large dual fuel) 2/1/2009
14.05 Controlled service - Interruptible load self-contained metering rider (Small dual fuel) 2/1/2009
14.06 Controlled service - Deferred load rider (Thermal storage) 2/1/2009
14.07 Fixed time of delivery rider 2/1/2009
14.08 Air conditioning control rider (CoolSavings) 2/1/2009
14.09 Renewable energy rider (TailWinds) 2/1/2009
14.10 WAPA bill crediting program rider 2/1/2009
14.11 Released energy rider (REAP) 2/1/2009
15.00 Minnesota electric service area  
15.00 Minnesota communities served 2/1/2009

 

Electric service - North Dakota Effective date
Index and General rules and regulations 12/1/2009
Section    
9.00 Residential and farm services  
9.01 Residential service 12/1/2009
9.02 Residential Demand Control service 12/1/2009
9.03 Farm service 12/1/2009
10.00 General services  
10.01 Small general service 12/1/2009
10.02 General service 12/1/2009
10.03 Large general service 12/1/2009
10.04 Commercial service - Time of use 12/1/2009
       Time of use period chart  
10.05 Large general service - Time of day 12/1/2009
       Time of day period chart  
11.00 Other services  
11.01 Standby service 12/1/2009
11.02 Irrigation service 12/1/2009
11.03 Outdoor lighting - Energy only 12/1/2009
11.04 Outdoor lighting 12/1/2009
11.05 Municipal pumping service 12/1/2009
11.06 Civil defense - Fire sirens 12/1/2009
12.00 Purchase power riders and applicability matrix 12/1/2009
12.01 Small power producer rider - Occasional delivery energy service 3/1/2010
12.02 Small power producer rider - Time of delivery energy service 3/1/2010
12.03 Small power producer rider - Dependable service 3/1/2010
13.00 Mandatory riders and applicability matrix 12/1/2009
13.01 Energy adjustment rider 12/1/2009
13.04 Renewable resource cost recovery rider 12/1/2009
14.00 Voluntary riders and applicability matrix 12/1/2009
14.01 Water heating control rider 12/1/2009
14.02 Real time pricing rider 12/1/2009
14.03 Large general service rider 12/1/2009
14.04 Controlled service - Interruptible load CT metering rider 12/1/2009
14.05 Controlled service - Interruptible load self-contained metering rider 12/1/2009
14.06 Controlled service - Deferred load rider 12/1/2009
14.07 Fixed time of delivery rider 12/1/2009
14.08 Air conditioning control rider 12/1/2009
14.09 Voluntary renewable energy rider 12/1/2009
14.10 WAPA bill crediting program rider 12/1/2009
14.11 Released Energy Access Program (REAP) rider 12/1/2009
14.12 Bulk interruptible service 12/1/2009
15.00 North Dakota electric service area  
15.00 Communities served 12/1/2009

 

Electric service - South Dakota Effective date
Index and General rules and regulations 7/1/2009
Section    
9.00 Residential and farm services  
9.01 Residential service 7/1/2009
9.02 Residential demand control service 7/1/2009
9.03 Farm service 7/1/2009
10.00 General services  
10.01 Small general service 7/1/2009
10.02 General service 7/1/2009
10.03 Large general service 7/1/2009
10.04 Commercial service - Time of use 7/1/2009
       Time of use period chart  
10.05 Large general service - Time of day 7/1/2009
       Time of day period chart  
11.00 Other services  
11.01 Standby service 7/1/2009
11.02 Irrigation service 7/1/2009
11.03 Outdoor lighting - energy only 7/1/2009
11.04 Outdoor lighting 7/1/2009
11.05 Municipal pumping service 7/1/2009
11.06 Civil defense - Fire sirens 7/1/2009
12.00 Power producer riders and applicability matrix 7/1/2009
12.01 Small power producer rider
- Occasional delivery energy service
7/1/2009
12.02 Small power producer rider
- Temperature time of delivery energy service
7/1/2009
12.03 Small power producer rider
- Dependable service
7/1/2009
13.00 Mandatory riders and applicability matrix 7/1/2009
13.01 Fuel adjustment clause rider 7/1/2009
13.04 Energy efficiency partnership (EEP) cost recovery rider 7/1/2009
14.00 Voluntary riders and availability matrix 7/1/2009
14.01 Water heating control rider 7/1/2009
14.02 Real time pricing rider 7/1/2009
14.03 Large general service rider 7/1/2009
14.04 Controlled service
- Interruptible load CT metering (Large dual fuel)
7/1/2009
14.05 Controlled service
- Interruptible load self-contained metering (Small dual fuel)
7/1/2009
14.06 Controlled service
-Deferred load (Thermal storage)
7/1/2009
14.07 Fixed time of delivery rider 7/1/2009
14.08 Air-conditioning control rider (CoolSavings) 7/1/2009
14.09 Voluntary renewable energy rider (TailWinds) 7/1/2009
14.11 Released Energy Access Program (REAP) rider 7/1/2009
14.12 Bulk interruptible service 7/1/2009
15.00 South Dakota electric service area  
15.00 Communities served 7/1/2009