Rates, Rules, and Regulations

This chart provides access to detailed information about our rate options and associated charges. The Minnesota Resource Adjustment includes some other charges you may notice on your bill.

Electric serviceEffective date
Index and General Rules and Regulations  01/01/2014
 
  • Section 9 - Residential and Farm Services

    9.01 Residential Service 10/01/2011
    9.02 Residential Demand Control Service 10/01/2011
    9.03 Farm Service 10/01/2011
  • Section 10 - General Services

    10.01 Small General Service (less than 20 kw) 10/01/2011
    10.02 General Service (20 kw or greater) 10/01/2011
    10.03 General Service - Time of use 10/01/2011
      Time of Use Period Chart  
    10.04 Large General Service 10/01/2011
    10.05 Large General Service - Time of Day 10/01/2011
      Time of Day Period Chart  
  • Section 11 - Other Services

    11.01 Standby Service 02/01/2014
    11.02 Irrigation Service 10/01/2011
    11.03 Outdoor Lighting - Energy Only 10/01/2011
    11.04 Outdoor Lighting 10/01/2011
    11.05 Municipal Pumping Service 10/01/2011
    11.06 Civil Defense - Fire Sirens 10/01/2011
  • Section 12 - Purchase-Power Riders

    12.00 Purchase-Power Riders - Applicability Matrix 10/01/2011
    12.01 Small Power Producer Rider (Net Energy Billing Rate) - residential, farm, general service, large general service 01/01/2014
    12.02 Small Power Producer Rider (Simultaneous Purchase and Sale Billing Rate) - firm power, nonfirm power 01/01/2014
    12.03 Small Power Producer Rider (Time of Day Purchase Rates) - firm power, nonfirm power 01/01/2014
    12.04 Distributed Generation Service Rider 10/01/2011
    12.05 Community-Based Energy Development (C-BED) Tariff 10/01/2011
  • Section 13 - Mandatory Riders

    13.00 Mandatory Riders - Applicability matrix 01/01/2014
    13.01 Energy Adjustment Rider 10/01/2011
    13.02 Conservation Improvement Project (CIP) Rider 11/01/2013
    13.03 Competitive Rate Rider - Large General Service 10/01/2011
    13.04 Renewable Resource Cost Recovery Rider 05/01/2013
    13.05 Transmission Cost Recovery Rider 04/01/2012
    13.06 Reserved for Future Use  01/01/2014
    13.07 Reserved for Future Use  01/01/2014
    13.08 Environmental Cost Recovery Rider 01/01/2014
  • Section 14 - Voluntary Riders

    14.00 Voluntary Riders - Applicability Matrix 06/01/2012
    14.01 Water Heating Control Rider 10/01/2011
    14.02 Real Time Pricing Rider 10/01/2011
    14.03 Large General Service Rider 10/01/2011
    14.04 Controlled Service - Interruptible Load CT Metering Rider (Large Dual Fuel) 10/01/2011
    14.05 Controlled Service - Interruptible Load Self-Contained Metering Rider (Small Dual Fuel) 10/01/2011
    14.06 Controlled Service - Deferred Load Rider (Thermal Storage) 10/01/2011
    14.07 Fixed Time of Service Rider 10/01/2011
    14.08 Air Conditioning Control Rider (CoolSavings) 06/01/2012
    14.09 Voluntary Renewable Energy Rider (TailWinds) 10/01/2011
    14.10 WAPA Bill Crediting Program Rider 11/28/2012
    14.11 Released Energy Rider 10/01/2011
  • Section 15 - Minnesota Electric Service Area

    15.00 Communities Served 10/01/2011