Rates, Rules, and Regulations

This chart provides access to detailed information about our rate options and associated charges. The North Dakota Energy and Renewable Adjustment includes other charges you may notice on your bill.

Electric Service  Effective Date
Index and General rules and regulations 02/01/2024

9.01 Residential Service 02/01/2024
9.02 Residential Demand Control Service 02/01/2019
9.03 Farm Service 02/01/2019
9.04 Reserved for Future Use 12/26/2021
10.01 Small General Service 02/01/2019
10.02 General Service 01/01/2023
10.03 General Service - Time of Use 01/01/2023
       Time of Use Period Chart  
10.04 Large General Service 01/01/2023
10.05 Large General Service - Time of Day 01/01/2023
       Time of Day Period Chart  
10.06 Super Large General Service 02/01/2019

 

11.01 Standby Service 02/01/2019
Time of Day Period Chart
11.02 Irrigation Service 02/01/2019
  Time of Use Period Chart  
11.03 Outdoor Lighting - Energy Only 02/01/2019
11.04 Outdoor Lighting 02/01/2019
11.05 Municipal Pumping Service 01/01/2023
11.06 Civil Defense - Fire Sirens 02/01/2019
11.07 LED Street and Area Lighting - Dusk to Dawn 01/01/2023
12.00 Purchase Power Riders - Availability matrix 12/26/2021
12.01 Small Power Producer Rider - Occasional Delivery Energy Service 04/01/2024
12.02 Small Power Producer Rider - Time of Delivery Energy Service 04/01/2024
12.03 Small Power Producer Rider - Dependable Service 04/01/2024
13.00 Mandatory Riders - Applicability Matrix 01/01/2024
13.01 Energy Adjustment Rider 01/01/2024
13.02 Reserved for Future Use 01/01/2023
13.03 Reserved for Future Use 01/01/2023
13.04 Renewable Resource Cost Recovery Rider 04/01/2024
13.05 Transmission Cost Recovery Rider 01/01/2024
13.06 Generation Cost Recovery Rider 01/01/2024
13.07 Reserved for Future Use 02/01/2019
13.08 Environmental Cost Recovery Rider 11/01/2019
13.09 Reserved for Future Use 01/01/2023
13.10 Reserved for Future Use 01/01/2023
13.11 Metering & Distribution Technology (MDT) Cost Recovery Rider  01/01/2024
13.12 Interim Rate Rider 01/01/2024
14.00 Voluntary riders - Availability matrix 12/26/2021
14.01 Water heating Control Rider 02/01/2019
14.02 Real Time Pricing Rider 12/01/2023
14.03 Large General Service Rider 12/01/2023
14.04 Controlled Service - Interruptible Load CT Metering Rider (Large Dual Fuel)  02/01/2019
14.05 Controlled Service - Interruptible Load Self-Contained Metering Rider (Small Dual Fuel)  02/01/2019
14.06 Controlled Service - Deferred Load Rider (Thermal Storage)  02/01/2019
14.07 Fixed Time of Delivery Rider 01/01/2023
14.08 Air Conditioning Control Rider 02/01/2019
14.09 Voluntary Renewable Energy Rider 02/01/2019
14.10 WAPA Bill Crediting Program Rider 02/01/2019
14.11 Reserved for Future Use 02/01/2019
14.12 Bulk Interruptible Service 02/01/2019
14.13 Economic Development Rate Rider - Large General Service 02/01/2019